top of page
Writer's pictureScott Ellis

Case Study: Blue Water Rail Services - Intranet SharePoint Project

Client Overview Blue Water Rail Services is a leading full-service transportation services provider based in Western Canada. They specialize in delivering customized supply-chain solutions, enhancing terminal capacity, streamlining operations, and improving infrastructure utilization. Their services include industrial development, terminal processing, and transloading. They are known for their strong safety performance and trusted partnerships within the transportation and supply chain sectors.

 

The Challenge Blue Water Rail Services faced challenges with communication and collaboration across its distributed teams. The existing intranet system was outdated and failed to meet the needs of a rapidly expanding workforce, resulting in inefficiencies, limited access to critical resources, and inconsistent communication. These issues negatively impacted productivity and employee engagement, making it essential to modernize their internal communication platform.


Concept Image Produced for Case Study

The Digital MacGyver Way Digital MacGyver approached this challenge by leveraging a user-centric design strategy to build a modern SharePoint intranet. The approach stood out by focusing on accessibility, employee experience, and integrating existing systems into the new SharePoint environment. Our expertise in SharePoint architecture, user experience (UX) design, and business process optimization ensured a comprehensive solution tailored to Blue Water Rail Services' specific needs.

 

Mission Brief The overarching goal of the project was to create a centralized, user-friendly platform for communication, collaboration, and document management. Our mission was to address the client's needs by improving usability, enhancing employee engagement, and reducing administrative overhead. We ensured the client’s objectives were met through stakeholder collaboration, iterative feedback loops, and rigorous testing to guarantee a seamless experience for end-users.

 

Challenges One of the specific obstacles during the project was migrating legacy content from the old system to SharePoint without disrupting ongoing business operations. Another challenge was ensuring that employees across different departments could easily adapt to the new system. These challenges were addressed through careful planning, a phased migration strategy, and comprehensive employee training sessions, which minimized disruptions and ensured successful adoption.

 

Why Digital MacGyver Digital MacGyver was selected thru the partnership of Washington Companies, due to our deep understanding of SharePoint and our track record of delivering successful intranet projects. Our expertise in creating engaging user experiences and optimizing business processes aligned perfectly with the client’s needs. Having worked with clients in similar industries, we brought valuable insights into the specific challenges faced by logistics companies, which made our solution highly effective.

 

The Approach The project began with a thorough analysis of Blue Water Rail Services’ existing intranet and employee workflows. Foundational elements like a content architecture plan, permissions structure, and a customized design system were established to ensure consistency. We built the solution using modern SharePoint features, including a custom component directory and optimized processes for content creation. Agile methodologies were employed, and we facilitated smooth handoffs between design and development by conducting regular review sessions and cross-functional collaboration.

 

The Results The new intranet delivered significant tangible results. Employee productivity increased due to faster access to information and improved search functionality. The solution transformed Blue Water Rail Services’ internal communication by enhancing brand consistency, operational efficiency, and the overall user experience. Specific improvements included streamlined document management, personalized content targeting, and better collaboration across teams.

 

Victory The overall success of the project was evident from the positive employee feedback and measurable improvements in engagement metrics. The final solution not only addressed immediate challenges but also set Blue Water Rail Services up for future success by providing a scalable platform that could evolve with their needs. The improved intranet has had a positive impact on the company’s growth, supporting both employee satisfaction and operational scalability.

 

Client Testimonial Blue Water Rail Services expressed their satisfaction with our work, emphasizing the professionalism and expertise we brought to the project. They highlighted the intuitive design, seamless migration, and improved user experience as key strengths that contributed to the success of the project.

 

Project Information The client operates in the transportation and logistics industry. The project involved building a SharePoint-based intranet platform to support internal communication and collaboration. Services provided included SharePoint architecture design, content migration, UX/UI design, and employee training.

 

Summary The major achievement of the project was the successful modernization of Blue Water Rail Services' intranet, resulting in improved communication, collaboration, and productivity. The new system provides a user-friendly, centralized platform that aligns with the company's operational needs and supports their growth. Moving forward, this solution will continue to serve as a foundation for efficient internal communication and help Blue Water Rail Services adapt to future challenges.

コメント


bottom of page